[Full] CPD Technical Visit to Automatic Welding Plant and Hot Dip Galvanized Plant

14 August 2021
CPD Code:CPD20210814V
Organized:Hong Kong Institute of Construction Managers (HKICM)
Date:14 August 2021 (Saturday)
Time:10:00 am - 12:30 pm
Speaker(s):

Mr. Tsoi Yik Pui, Consultant of Wo Lee Green Solutions Ltd,
Mr. Billy Wong, Marketing Manager

Language:Cantonese
Priority:HKICM Member; First-come, first-served
Enrollment Fee:Member : HK$ 200.00*
Non-member : HK$ 230.00
*The registration fee includes transportation between Kowloon Tong Station and venue
Deadline:2 August 2021 (Monday)

Program Highlights:

Visit 1: Automatic Welding Plant
Wo Lee Green Solutions Ltd. have installed four Automatic Welding Machines recently to meet the growing need of off-site welding, as parts of off-site solution. Wo Lee Green Solutions Ltd is committed to introduce advanced technology to tackle shortage of welders in the market. The human touch in the automated welding process is just flicking the switch to get started. By freeing up workers to perform more dexterous tasks, automatic welding machines are favourable to cut costs and maximize efficiency in modern construction. Automated welding machines offer four main advantages, they are improving weld quality, increasing output, decreasing scrap and decreasing costs.

Visit 2: Hot Dip Galvanized Plant
Established in 1978 and based in Hong Kong, Yau Sang Galvanizing (Hot-dip) Co. Ltd is the sole hot-dip galvanizing factory in Hong Kong with a production plant built in Dongguang in 2015. The visit go through the process from materials inspection, degreasing and rinsing, pickling and rinsing, fluxing, hot-dip galvanizing in a zinc bath, cooling and final inspection before packaging to the clients. Using zinc ingots from Canada, the USA and Europe having 99.8% purity, Yau Sang ensures both the materials and process complies with BS EN ISO 1461.

Itinerary:

Date 14 August 2021 (Saturday)
Time Location
09:00 Assembly Point at Kowloon Tong Station – Exit D
09:10 Depart to Wo Lee Build Tech Centre at Ping Che (Fanling)
10:00-10:45 Visit 1: Automatic Welding Plant
11:00 Depart to Yau Sang Galvanizing Plant at Yuen Long Industrial Estate
11:30-12:30 Visit 2: Hot Dip Galvanized Plant
12:45 Depart back to Long Ping Station and Kowloon Tong Station

Important Notes:

  1. This is an online pre-registration only and the seat reserved will only be confirmed by an e-mail sent to the successful registrant in due course upon receipt of the registration fee.
  2. The talk will be conducted online via Zoom. Successful registrants will be notified separately via email with the meeting ID in due course to the online event . 
  3. Information collected, including name, phone number, email address and postal address, will only be used for the purpose of processing booking or general enquires related to HKICM, and will be treated in confidence and not be disclosed to any other party. 
  4. HKICM reserves the right of final decision and interpretation in the case of any dispute.

Share To:

Share on facebook
Facebook
Share on xing
XING
Share on google
Google+
Share on skype
Skype
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on email
Email