Statutory Amendments Update

5 June 2023

Dear Members,

The Building Authority (BA) has issued the following updated Practice Note for Authorized Persons, Registered Structural Engineers, Registered Geotechnical Engineers, Registered Contractors and other technical information on Apr-May 2023,  which can be viewed /downloaded from the link below:

PNAP Updates on Apr-May 2023

Date  Item no. Description QR Code
Apr 2023 2023_10 PNAP APP-164 “Enhanced Design Standards of Aboveground Drainage System”
May 2023 2023_11 PNAP APP-45 “Testing of Reinforcement for Concrete”
May 2023 2023_12 PNAP APP-97 “Consent Procedures for Building Works and Street Works”
May 2023 2023_13 PNAP ADM-19 “Building Approval Process”
May 2023 2023_14 PNAP ADV-34 “Building Information Modelling”

 

PNRC Updates on May 2023

Date  Item no. Description QR Code
May 2023 2023_06 PNRC 33 “Testing of Reinforcement for Concrete”

 

Other Technical Information Updates on Apr-May 2023

Date  Item no. Description QR Code
Apr 2023 2023_10 Issue of Circular Letter on “Prevention Measures at Construction Sites during Rainy and Typhoon Seasons”
May 2023 2023_11 Issuance of revised PNBI-10 – “Code of Practice for the Mandatory Building Inspection Scheme and the Mandatory Window Inspection Scheme”
May 2023 2023_12 Code of Practice for the Mandatory Building Inspection Scheme and the Mandatory Window Inspection Scheme 2012 (2023 Edition)

 

Important Notes:

  1. This is an online pre-registration only and the seat reserved will only be confirmed by an e-mail sent to the successful registrant in due course upon receipt of the registration fee.
  2. The talk will be conducted online via Zoom. Successful registrants will be notified separately via email with the meeting ID in due course to the online event . 
  3. Information collected, including name, phone number, email address and postal address, will only be used for the purpose of processing booking or general enquires related to HKICM, and will be treated in confidence and not be disclosed to any other party. 
  4. HKICM reserves the right of final decision and interpretation in the case of any dispute.

Share To:

Share on facebook
Facebook
Share on xing
XING
Share on google
Google+
Share on skype
Skype
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on email
Email