This signature Temporary Works (TW) programme is designed to promote good practice to TW in the Hong Kong construction industry. It aims to develop participants’ knowledge and practical competence to achieve optimised TW solutions with safe outcomes through the adoption of a systematic control framework for temporary works design and management that can help minimise the risk of TW failure in a construction project.
- An overview of Design for Safety (DfS) on Temporary Works Design and Management in Construction Industry
- Temporary Works Design and Management: Statutory Requirements; Risk Management; Roles and Responsibilities; TW Policy, Procedures and Process.
- Temporary Works Management Plan and Application of Innovative Technologies: Special Temporary Works Solutions.
- Implementation of Falsework and Formwork in Hong Kong:Scaffolding Systems – Planning; Design; Installation; Monitoring and Dismantling.
- Case Study 1: A Building Project – Excavation and Lateral Support.
- Case Study 2: A Building Project – Demolition of the Building.
- Integrated Group Projects (by Project Teams): Application of Temporary Works Design and Management
Couse schedule:
Lesson 1: 12 Feb 2025
Lesson 2: 19 Feb 2025
Lesson 3: 05 Mar 2025
Lesson 4: 12 Mar 2025
Lesson 5: 19 Mar 2025
Lesson 6: 09 Apr 2025
Lesson 7: 23 Apr 2025
(Wednesday)
Total course hour: 16hours
Time: 3:00pm – 5:00pm (lesson 1 to lesson 6) & 2:00pm – 6:00pm (lesson 7)
Venue: HKIC, Kowloon Bay Campus, G/F, Lecture Theatre, Kowloon Bay
Please register via below link: https://www.hkic.edu.hk/en/programmes/master-class/twes