Back
 
[FULL] Joint CPD Talk: Hong Kong - Zhuhai - Macao Bridge – Design and Build Contract of Viaduct for Hong Kong Link Road
08/02/2021

Jointly Organized by:  
                


*FULL*


Joint CPD Talk:

Hong Kong - Zhuhai - Macao Bridge
– Design and Build Contract of Viaduct for Hong Kong Link Road

 

Jointly organized by The Hong Kong Institute of Surveyors (Quantity Surveying Division) ((HKIS(QSD)), The Hong Kong Institution of Engineers - Building Division (HKIE-BUD) and Hong Kong Institute of Construction Managers (HKICM), Joint CPD Talk: Hong Kong - Zhuhai - Macao Bridge – Design and Build Contract of Viaduct for Hong Kong Link Road will soon be held with details:-
     
Date : 8 February 2021 (Monday)
Time : 7:00 pm - 8:30 pm 
Venue : Online CPD Live via Zoom
Speaker





 
:





 
Ir CHAN Man
Ir CHAN Man was the Project Director for HZMB Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill.  He was also an Executive Director of the Hong Kong office of an international construction company.  His professional experience covers various type of project such as marine works, viaduct construction, infrastructures, building works, etc.  He had also worked overseas in some large-scale projects.  He is passionate in performing institutional duties for professional bodies.
Content Details















 
:















 
The Hong Kong - Zhuhai - Macao Bridge (HZMB) is the longest sea-crossing road infrastructure in the world providing a direct land transport connection between two shores of the Pearl River Delta, linking Hong Kong in the east to Macao and Zhuhai in the west.  The Hong Kong Link Road (HKLR) under Highways Department is a prominent structure that serves to connect the Main Bridge of HZMB from the HKSAR Boundary to the Scenic Hill on the Airport Island.  It is worth to note that the Hong Kong section of the Hong Kong-Zhuhai-Macao Bridge (HZMB) has won the 2019 ICE People’s Choice Award.

The work comprises mainly design and construction of approximately 9.4km of precast segmental viaducts supporting dual 3-lane carriageways.  These viaducts were built by balanced cantilever method, using either Lifting Frames, cranes or Launching Girders.

Ir CHAN Man will highlight the challenges and solutions employed in deck precasting and erection engineering of the viaducts.  The main challenges on the project including the management of the marine logistic, the deck erection in open sea, the vicinity of the Airport and environmental constraints.  The salient points on the design and build contract administration will also be discussed.
Language : English supplemented by Cantonese
Priority : HKICM, HKIE(BUD) and HKIS QSD members; first-come-first-served basis
Fee : Free of Charge
Deadline : 1 February 2021 (Monday)

 

To register:  

Please refer to the Online Registration Form. Successful registrants will be notified separately via email with the Zoom link in due course to the CPD talk.

 

For enquiries, please contact the HKICM secretariat Office at Tel: (852) 2523 2081 or e-mail: info@hkicm.org.hk.

 

HKICM Secretariat
12 January 2021